Call Now: 02988-281210
Email: jnvbarmer@yahoo.com
jnvbarmer02@gmail.com

INFRASTRUCTURE

I

Area of land  allotted (in acres)

Whether land transferred in the Name of Samiti

 Vidyalaya shifted to permanent buildings on

: 30 Akar

: Yes

: Yes

ii

Status of Boundary Wall

a.  Brick Wall

b.  Barbed wire fencing

: (Completed / Incomplete)

Yes

Yes. Barbed wire fencing available.

iii

Permanent buildings constructed

: (CBRI pattern/ CPWD pattern)

The old building CPWD and new CBRI pattern

iv

School building

: Complete

v

Dormitories

:  Boys _____24_________ Nos.

   with Warden Residence___2___ Nos.

 

 

:  Girls _____16_________ Nos.

   with Warden Residence____2__ Nos.

 

vi

Kitchen/dining Hall

:  Complete

02 Dinning hall are available

vii

Principal Residence

:  _1__ No.

viii

Staff Quarters

: Type III = ___12___ Nos.

  Type II = ______12_ Nos.

  Type  I  = ____12___ Nos.

 Qrs.:_nil____ Nos.

ix

M.P. Hall

: AVAILABLE

x

Workshop

: AVAILABLE

xi

Type of O.H. Tank

Its capacity

Present Status

: Column based

:  Shaft type    1 LAKH GAYLAIN

: in working condition

xii

U.G. tank

Its capacity

Present Status

1.5 LAKH GAYLAIN

: in working condition

xiii

D.G. Set

 Present Status

:  Available

: 25 KVA KIRLOSKER

: Working condition

: Year of procurement  2009-10

xiv

Sewage Pump

: not available   

xv

Water Pump

: 12 HP capacity

xvi

Electrification

Electric connection

Sub Station building

Street lighting

Numbers of hrs. during day when power supply is available on an average.

:  Direct  Feeder

:  Complete

: _____68_____ Nos. of Poles

: ____20____ hrs.

xvii

Playfields

39.40 X 55 Meter Hockey Ground

105 X 65 Meter Football Ground

400 metre track

40 x 30 metre basket ball court

9 x 18 metre volley ball court

40 x 20 metre Hand ball court

: 01 Nos.   – Available

: 01 Nos.   – Available

: Not available

:  03 Nos.   – Available

:  04 Nos.   – Available

: 03 Nos.   – Available

xviii

Water supply

Tube Well

Hand pump

Connection from PHED

: Not Available

Connected to PHED

xix

Rajiv Gandhi Smriti Van

:  Available

xx

Fire fighting arrangement

:  Working

xxi

Last date of cleaning of

(a)    Septic tank

(b)    Water tanks

: During the month of June, 2017

xxii

Whether area around transformer is fenced

:  Yes 

xxiii

Whether open wells, if any, are covered from top

:   Open Well not available in campus.

xxiv

Works taken up under M&R fund during current year .

:

Year

Name of work  (M&R)

Expenditure

(Rs. In lakhs)

2016-17

Day to Day maintenance works as required

4.49 Lakh